About the Project

The Elgin Area Water Treatment Plant was originally constructed circa the mid-1960’s, and while it has undergone upgrades and capital investment to improve its water treatment and transmission processes, it remains sized to only accommodate a rated capacity of 91MLD (megaliters per day).

In response to unprecedented flow projections associated with the significant anticipated growth and development in the region, the Master Plan recommended undertaking a Schedule C Municipal Class Environmental Assessment for a future anticipated plant expansion. The intent of this Environmental Assessment study is to identify, evaluate, and determine the preferred technology, processes, and location recommended for any future Elgin Area Water Treatment Plant upgrades and/or expansion. See map below for the existing plant location and associated Environmental Assessment Study Area.

Completing this study now will help to ensure the utility is both adequately prepared for and able to adapt to the future demands anticipated on our water system.

About the Project The Elgin Area Water Treatment Plant was originally constructed circa the mid-1960’s, and while it has undergone upgrades and capital investment to improve its water treatment and transmission processes, it remains sized to only accommodate a rated capacity of 91MLD (megaliters per day). In response to unprecedented flow projections associated with the significant anticipated growth and development in the region, the Master Plan recommended undertaking a Schedule C Municipal Class Environmental Assessment for a future anticipated plant expansion. The intent of this Environmental Assessment study is to identify, evaluate, and determine the preferred technology, processes, and location recommended for any future Elgin Area Water Treatment Plant upgrades and/or expansion. See map below for the existing plant location and associated Environmental Assessment Study Area. Completing this study now will help to ensure the utility is both adequately prepared for and able to adapt to the future demands anticipated on our water system. Project Timeline • Summer 2026: Study Initiation • Late Fall 2026: Public Information Centre #1 • Spring 2027: Public Information Centre #2 • Summer 2027: Final Environmental Study Report and Project Completion Get In Touch Huron Erie Water welcomes anyone with an interest in this study to have an opportunity to provide input to inform the decision-making process. If you have comments, questions, or require further information, please complete the form below: (use same messaging form as on the admin building page; comments submitted should be directed to the project email: EA4231@huronelginwater.ca) Project Links Previous Board Reports on the Project: December 4, 2025 (page 51)

Project Timeline

  • Summer 2026: Study Initiation
  • Late Fall 2026: Public Information Centre #1
  • Spring 2027: Public Information Centre #2
  • Summer 2027: Final Environmental Study Report and Project Completion

Get In Touch

Huron Erie Water welcomes anyone with an interest in this study to have an opportunity to provide input to inform the decision-making process. If you have comments, questions, or require further information, please complete the form below: